Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
Solicitation monitored from sam-gov.
- Buyer / agency
- DEPT OF DEFENSE
- Notice type
- Solicitation
- Solicitation number
- W9127N26BA024
- Posted
- August 19, 2026
- Response deadline
- September 18, 2026
- Location
- OR, US
- Estimated value
- Not published by the source
- NAICS
- 237310
- Source
- sam-gov
Summary
The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34�4�� out-to-out, with two 11�0� travel lanes, two 2�0� shoulders, a 5�0� sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located imme…
See the official source link, all documents, and the full solicitation text — and prepare a proposal working draft with AI — with a free Octobid account.
Summaries are indexed from official public sources; the issuing platform’s notice, documents, and amendments always control.